City Gross Merkez
Beefull · Macun Mahallesi 204. Caddesi No:18 Yenimahalle / ANKARA
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
AC: ilk 60 dk ücretsiz; sonra 150 ₺, 120. dk 300 ₺, 180. dk 450 ₺, 240. dk 500 ₺. DC: ilk 15 dk ücretsiz; sonra 150 ₺, 30. dk 300 ₺, 45. dk 450 ₺, 60. dk 600 ₺.source
With the Beefull app you can also charge at
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 180kW
CCS2×2
HPC
Price
Beefull doesn't publish a price for this point. The current tariff is shown in the network's own app. Beefull website
Facility
- Located at: Shopping mall
- Nearby: Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 20th by power among the 473 points with known power in Yenimahalle district. The nearest other DC point is 150 m away: City Gross-Merkez Mağaza (ZES, 400 kW). There are 424 more DC points within 10 km. Nearby (3 km): 105 other points and 27 networks; you may need different networks' apps.
The Beefull network has 32 points in Ankara province; this one is among those in the Yenimahalle area.
- Power rank in Yenimahalle
- 20 / 473
- Nearest other DC
- 150 m
- 3 km radius
- 106 points · 27 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Beefull app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at City Gross Merkez?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does City Gross Merkez have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
City Gross-Merkez Mağaza
130 m · ZES · CCS2
400kW
Erkaya Bosch Car Service
307 m · ZES · Type 2
22kW
Erkaya Bosch Araç Servisi
316 m · ZES · Type 2
22kW
TotalEnergies DOCO Macunköy
330 m · Otojet · CCS2
30kW
A City AVM DC 240 kW
344 m · Neva Şarj · CCS2
240kW
LUMICLE ANKARA ABÜŞRA 22 kW AC-2
377 m · Lumicle · Type 2
22kW
Source: EPDK licence record (ŞRJ/2133) · Updated: 2 November 2026 at 17:35 · How the data is collected
