Astorşarj Özkaymak Marina Otel Elektrikli Araç Şarj İstasyonu
Astor Şarj · Erkez Mahallesi Onna Tunç Caddesi No:7 Kemer / ANTALYA
- Max power
- 300kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 300kW
CCS2×2
HPC13.99 ₺/kWh
Price
- DC
- 13.99 ₺/kWh
Astor Şarj standard tariff; prices may vary by location. Tariff source
Facility
- Nearby: Restaurant
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 300 kW, one of the 2 most powerful points among the 70 points with known power in Kemer district. The nearest other DC point is at the same address: Özkaymak Marina Otel, Antalya (Eşarj, 120 kW). There are 20 more DC points within 10 km. Nearby (3 km): 42 other points and 16 networks; you may need different networks' apps.
The DC tariff of 13.99 ₺/kWh is 6% below the median of the 183 known DC tariffs in Antalya (14.90 ₺/kWh). The Astor Şarj network has 10 points in Antalya province; this one is among those in the Kemer area.
- Power rank in Kemer
- 1 / 70
- Nearest other DC
- at the same address
- 3 km radius
- 43 points · 16 networks
- DC tariff
- 13.99 ₺/kWh
Charging time here from 10% to 80% (300 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 20 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Astor Şarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Astorşarj Özkaymak Marina Otel Elektrikli Araç Şarj İstasyonu?
Approximate 10% to 80% times with the 300 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 20 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 300 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Astorşarj Özkaymak Marina Otel Elektrikli Araç Şarj İstasyonu?
According to the tariff published by the Astor Şarj network, prices at this point are: DC 13.99 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 870 ₺ at the DC tariff. Payment is made with the Astor Şarj app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Astorşarj Özkaymak Marina Otel Elektrikli Araç Şarj İstasyonu have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 300 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Source: EPDK licence record (ŞRJ/6932) · Updated: 2 November 2026 at 17:35 · How the data is collected
