Astorşarj Bi'mola Reşadiye Elektrikli Araç Şarj İstasyonu
Astor Şarj · Ömerli Mahallesi 34974 Sokağı Çekmeköy / İSTANBUL
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 180kW
CCS2×2
HPC13.99 ₺/kWh
Price
- DC
- 13.99 ₺/kWh
Astor Şarj standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 5th by power among the 132 points with known power in Çekmeköy district. The nearest other DC point is at the same address: Astorşarj Bi'mola Ömerli Elektrikli Araç Şarj İstasyonu (Astor Şarj, 180 kW). There are 50 more DC points within 10 km. Nearby (3 km): 14 other points and 11 networks.
The DC tariff of 13.99 ₺/kWh is 6% below the median of the 877 known DC tariffs in İstanbul (14.90 ₺/kWh). The Astor Şarj network has 25 points in İstanbul province; this one is among those in the Çekmeköy area.
- Power rank in Çekmeköy
- 5 / 132
- Nearest other DC
- at the same address
- 3 km radius
- 15 points · 11 networks
- DC tariff
- 13.99 ₺/kWh
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Astor Şarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Astorşarj Bi'mola Reşadiye Elektrikli Araç Şarj İstasyonu?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Astorşarj Bi'mola Reşadiye Elektrikli Araç Şarj İstasyonu?
According to the tariff published by the Astor Şarj network, prices at this point are: DC 13.99 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 870 ₺ at the DC tariff. Payment is made with the Astor Şarj app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Astorşarj Bi'mola Reşadiye Elektrikli Araç Şarj İstasyonu have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Astorşarj Bi'mola Ömerli Elektrikli Araç Şarj İstasyonu
0 m · Astor Şarj · CCS2
180kW
Ömerli Çarşı, Çekmeköy - DC 2
543 m · OtoPriz · CCS2
180kW
Ömerli Çarşı, Çekmeköy - DC 1
555 m · OtoPriz · CCS2
180kW
Otojet - Ekmel Akaryakıt
717 m · Otojet · CCS2 · Type 2
60kW
Shell Alemdar
717 m · Trugo · CCS2
180kW
BioGreen: Minimall AVM - 180 kW DC
729 m · Biogreen · CCS2
180kW
Source: EPDK licence record (ŞRJ/2430) · Updated: 2 November 2026 at 17:35 · How the data is collected
