Tekstil Kent Çarşı
AOS · Atışalanı Çarşı Mahallesi Genel Aydınlatma Caddesi Esenler / İSTANBUL
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
- Open
- 24/7
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×2
HPC
Price
AOS doesn't publish a price for this point. The current tariff is shown in the network's own app. AOS website
Facility
- Opening hours: Open 24/7
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 74 points with known power in Esenler district, it is 2nd (180 kW). The nearest other DC point is 400 m away: Emlak Konutları 2.Etap 60kW DC (GEL DOL, 60 kW). There are 381 more DC points within 10 km. Within 3 km there are 99 other charging points and 31 different networks in total; if one is busy, an alternative is easy to find nearby.
The AOS network has 100 points in İstanbul province; this one is among those in the Esenler area.
- Power rank in Esenler
- 2 / 74
- Nearest other DC
- 400 m
- 3 km radius
- 100 points · 31 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the AOS app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Tekstil Kent Çarşı charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Tekstil Kent Çarşı have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Is Tekstil Kent Çarşı open 24/7?
Yes, according to the records Tekstil Kent Çarşı is open 24/7; you can charge at night too. For points inside shopping malls, hotels or car parks, the venue's opening hours may also apply; before setting off, it's a good idea to check the point's live status in the AOS app.
Other points nearby
Emlak Konutları 1.Etap C Blok 22 kW AC 02
346 m · GEL DOL · Type 2
22kW
Emlak Konutları 1.Etap A-B Blok 22 kW AC 03
351 m · GEL DOL · Type 2
22kW
Otopratik (Arıcıoğlu), Esenler
406 m · Eşarj
Emlak Konutları 2.Etap 60kW DC
406 m · GEL DOL · CCS2
60kW
Emlak Konutları 2.Etap 22 kW AC 09
434 m · GEL DOL · Type 2
22kW
Emlak Konuları 2.Etap 22 kW AC 08
434 m · GEL DOL · Type 2
22kW
Source: EPDK licence record (ŞRJ/3833) · Updated: 2 November 2026 at 17:35 · How the data is collected
