Pamukkale Belediyesi Aktepe Sosyal Tesisleri DC
AOS · Aktepe, 2403. Sk. No:34, 20170 Denizli Merkez/Denizli, Türkiye
- Max power
- 60kW
- Connectors
- 1
- Current
- DC
- Open
- 24/7
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 60kW
CCS2×1
DC
Price
AOS doesn't publish a price for this point. The current tariff is shown in the network's own app. AOS website
Facility
- Opening hours: Open 24/7
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 54 points with known power in Pamukkale district, it is 18th (60 kW). The nearest other DC point is 950 m away: Shell Dokuz Kavaklar (Trugo, 180 kW). There are 58 more DC points within 10 km. Within 3 km there are 23 other charging points and 15 different networks in total.
The AOS network has 5 points in Denizli province; this one is among those in the Pamukkale area.
- Power rank in Pamukkale
- 18 / 54
- Nearest other DC
- 950 m
- 3 km radius
- 24 points · 15 networks
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the AOS app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Pamukkale Belediyesi Aktepe Sosyal Tesisleri DC charging station?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Pamukkale Belediyesi Aktepe Sosyal Tesisleri DC have?
This point has 1 recorded socket: CCS2 (DC, 60 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Is Pamukkale Belediyesi Aktepe Sosyal Tesisleri DC open 24/7?
Yes, according to the records Pamukkale Belediyesi Aktepe Sosyal Tesisleri DC is open 24/7; you can charge at night too. For points inside shopping malls, hotels or car parks, the venue's opening hours may also apply; before setting off, it's a good idea to check the point's live status in the AOS app.
Other points nearby
Pamukkale Belediyesi Aktepe Sosyal Tesisleri AC
0 m · AOS · Type 2
22kW
Shell Dokuz Kavaklar
966 m · Trugo · CCS2
180kW
ATS Sevindik İş Merkezi, Denizli
1.8 km · Eşarj · CCS2
120kW
Teras Park AVM Denizli
1.9 km · ZES · CCS2
180kW
TÜVTÜRK Araç Muayene İstasyonu-Merkez/DENİZLİ
2.0 km · Tüvturk · Type 2
22kW
Acar Otomotiv, Denizli
2.0 km · Eşarj · CCS2
120kW
Source: AOS + EPDK licence record · Updated: 20 August 2026 at 11:11 · How the data is collected
