BALIKESİR YÜKSEL DİNLENME TESİSLERİ 180 kW DC-1
AOS · Akçaköy, 275. Sokak No:2, 10662 Altıeylül/Balıkesir
- Max power
- 180kW
- Connectors
- 1
- Current
- HPC
- Open
- 24/7
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×1
HPC
Price
AOS doesn't publish a price for this point. The current tariff is shown in the network's own app. AOS website
Facility
- Opening hours: Open 24/7
- Nearby: Restaurant
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 2nd by power among the 45 points with known power in Altıeylül district. The nearest other DC point is at the same address: BALIKESİR YÜKSEL DİNLENME TESİSLERİ 180 kW DC-2 (AOS, 180 kW). There is 1 more DC point within 10 km. The AOS network has 4 points in Balıkesir province; this one is among those in the Altıeylül area.
- Power rank in Altıeylül
- 2 / 45
- Nearest other DC
- at the same address
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the AOS app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at BALIKESİR YÜKSEL DİNLENME TESİSLERİ 180 kW DC-1?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does BALIKESİR YÜKSEL DİNLENME TESİSLERİ 180 kW DC-1 have?
This point has 1 recorded socket: CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Is BALIKESİR YÜKSEL DİNLENME TESİSLERİ 180 kW DC-1 open 24/7?
Yes, according to the records BALIKESİR YÜKSEL DİNLENME TESİSLERİ 180 kW DC-1 is open 24/7; you can charge at night too. For points inside shopping malls, hotels or car parks, the venue's opening hours may also apply; before setting off, it's a good idea to check the point's live status in the AOS app.
Other points nearby
BALIKESİR YÜKSEL DİNLENME TESİSLERİ 180 kW DC-2
0 m · AOS · CCS2
180kW
Pamukçu Onhann Thermal
12 km · Ekos · CCS2
60kW
Mavi Kent Sitesi
15 km · HIZZLAN Charge N'Drive · Type 2
22kW
2 Nolu Kurtdereli Otoparkı
15 km · Ekos · Type 2
22kW
Togg Deneyim Merkezi Koçaslanlar Altıeylül
16 km · Trugo · CCS2
180kW
Bigadiç Devlet Hastanesi
16 km · Trugo · Type 2
22kW
Source: AOS + EPDK licence record · Updated: 20 August 2026 at 11:14 · How the data is collected
