PO Tuzla (Teknomak)

5 Şarj · Tepeören Mahallesi İstanbul Park Sokağı No:36 Tuzla / İSTANBUL

Max power
180kW
Connectors
2
Current
HPC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

Nearby while you chargeCafé

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

See it on the map with nearby points

Connectors

  • CCS2×2

    HPC15.90 ₺/kWh

    180kW

Price

DC
15.90 ₺/kWh

5 Şarj standard tariff; prices may vary by location. Tariff source

Facility

  • Located at: Fuel station
  • Nearby: Café
  • According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

In the power ranking among the 105 points with known power in Tuzla district, it is 5th (180 kW). The nearest other DC point is 400 m away: Shell Akfırat (Trugo, 180 kW). There are 85 more DC points within 10 km. Within 3 km there are 13 other charging points and 8 different networks in total; if one is busy, an alternative is easy to find nearby.

The DC tariff of 15.90 ₺/kWh is 7% above the median of the 877 known DC tariffs in İstanbul (14.90 ₺/kWh). The 5 Şarj network has 47 points in İstanbul province; this one is among those in the Tuzla area.

Power rank in Tuzla
5 / 105
Nearest other DC
400 m
3 km radius
14 points · 8 networks
DC tariff
15.90 ₺/kWh

Charging time here from 10% to 80% (180 kW DC)

Togg T10X
≈ 35 min
Tesla Model Y Long Range
≈ 25 min
MG4 (64 kWh)
≈ 30 min
BYD Atto 3
≈ 35 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the 5 Şarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How long does charging from 10% to 80% take at the PO Tuzla (Teknomak) charging station?

Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

How much does charging cost at PO Tuzla (Teknomak)?

According to the tariff published by the 5 Şarj network, prices at this point are: DC 15.90 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 990 ₺ at the DC tariff. Payment is made with the 5 Şarj app or card; any idle or parking fee is shown in the network's app, and tariffs may change.

Which sockets does PO Tuzla (Teknomak) have?

This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Other points nearby

straight-line

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: EPDK licence record (ŞRJ/4298) · Updated: 2 November 2026 at 17:35 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy