PO Lüleburgaz (Albeni)
5 Şarj · Yenibedir Mahallesi Yeni Bedir Küme Evleri Sokağı Yenibedir Lüleburgaz / KIRKLARELİ
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×2
HPC15.90 ₺/kWh
Price
- DC
- 15.90 ₺/kWh
5 Şarj standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 23 points with known power in Lüleburgaz district, it is 2nd (180 kW). The nearest other DC point is 5.5 km away: Eurorepar, Arıner Otomotıv, Lüleburgaz (Eşarj, 30 kW). There are 14 more DC points within 10 km. The DC tariff of 15.90 ₺/kWh is 7% above the median of the 24 known DC tariffs in Kırklareli (14.90 ₺/kWh).
- Power rank in Lüleburgaz
- 2 / 23
- Nearest other DC
- 5.5 km
- DC tariff
- 15.90 ₺/kWh
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the 5 Şarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the PO Lüleburgaz (Albeni) charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at PO Lüleburgaz (Albeni)?
According to the tariff published by the 5 Şarj network, prices at this point are: DC 15.90 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 990 ₺ at the DC tariff. Payment is made with the 5 Şarj app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does PO Lüleburgaz (Albeni) have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Eurorepar, Arıner Otomotıv, Lüleburgaz
5.5 km · Eşarj · CCS2
30kW
MK Kocamanoğlu Şarj İstasyonu
5.5 km · Türkşarj · Type 2
22kW
Lüleburgaz Toki
5.9 km · OnLIFE · Type 2
22kW
Enerji Petrol-Karamusul
6.6 km · Energy Enerjik · Type 2
22kW
Otopratik (Çaykara Oto), Kırklareli
6.7 km · Eşarj
Burgaz İzer Hotel
6.7 km · WAT Mobilite · CCS2
120kW
Source: EPDK licence record (ŞRJ/14893) · Updated: 2 November 2026 at 17:35 · How the data is collected
