PO Edremit (Çapanoğlu)
5 Şarj · Hamidiye Mahallesi Vehbi Görgün Caddesi Edremit / BALIKESİR
- Max power
- 133kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 133kW
CCS2×2
DC15.90 ₺/kWh
Price
- DC
- 15.90 ₺/kWh
5 Şarj standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 53 points with known power in Edremit district, it is 14th (133 kW). The nearest other DC point is 350 m away: Edremit Eski HAN Otopark (HIZZLAN Charge N'Drive, 120 kW). There are 26 more DC points within 10 km. Within 3 km there are 20 other charging points and 14 different networks in total.
The DC tariff of 15.90 ₺/kWh is 6% above the median of the 111 known DC tariffs in Balıkesir (14.98 ₺/kWh). The 5 Şarj network has 9 points in Balıkesir province; this one is among those in the Edremit area.
- Power rank in Edremit
- 14 / 53
- Nearest other DC
- 350 m
- 3 km radius
- 21 points · 14 networks
- DC tariff
- 15.90 ₺/kWh
Charging time here from 10% to 80% (133 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the 5 Şarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the PO Edremit (Çapanoğlu) charging station?
Approximate 10% to 80% times with the 133 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 133 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at PO Edremit (Çapanoğlu)?
According to the tariff published by the 5 Şarj network, prices at this point are: DC 15.90 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 990 ₺ at the DC tariff. Payment is made with the 5 Şarj app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does PO Edremit (Çapanoğlu) have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 133 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
TP Edremit Balıkesir
0 m · ZES · Type 2
11kW
Edremit Eski HAN Otopark
358 m · HIZZLAN Charge N'Drive · CCS2
120kW
Edremit Terminal
678 m · Ekos · Type 2
22kW
10-Edremit-Sarıkız-Olivecity
700 m · Lumicle · CCS2 · Type 2
180kW
Asude GÜL 2 Petrol Tesisleri
908 m · Sharz · Type 2
22kW
Ülkü Tepesi AC-1
1.1 km · Beefull · Type 2
22kW
Source: EPDK licence record (ŞRJ/13469) · Updated: 2 November 2026 at 17:35 · How the data is collected
