PO Bergama (Aysallar)
5 Şarj · Ertuğrul Mahallesi İzmir Çanakkale Yolu Üzeri Caddesi No:2 Beylik Bergama / İZMİR
- Max power
- 240kW
- Connectors
- 4
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 240kW
CCS2×4
HPC15.90 ₺/kWh
Price
- DC
- 15.90 ₺/kWh
5 Şarj standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 240 kW, it ranks 3rd by power among the 16 points with known power in Bergama district. The nearest other DC point is at the same address: Zeytindağı Batı OHT (OnCharge, 120 kW). There are 11 more DC points within 10 km. Nearby (3 km): 6 other points and 6 networks; if one is busy, an alternative is easy to find nearby.
The DC tariff of 15.90 ₺/kWh is 7% above the median of the 180 known DC tariffs in İzmir (14.90 ₺/kWh). The 5 Şarj network has 2 points in İzmir province; this one is among those in the Bergama area.
- Power rank in Bergama
- 3 / 16
- Nearest other DC
- at the same address
- 3 km radius
- 7 points · 6 networks
- DC tariff
- 15.90 ₺/kWh
Charging time here from 10% to 80% (240 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 20 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the 5 Şarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at PO Bergama (Aysallar)?
Approximate 10% to 80% times with the 240 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 20 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 240 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at PO Bergama (Aysallar)?
According to the tariff published by the 5 Şarj network, prices at this point are: DC 15.90 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 990 ₺ at the DC tariff. Payment is made with the 5 Şarj app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does PO Bergama (Aysallar) have?
This point has 4 recorded sockets: 4 × CCS2 (HPC, 240 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Zeytindağı Batı OHT
0 m · OnCharge · CCS2
120kW
Zeytindağı Doğu OHT
0 m · OnCharge · CCS2
120kW
Bahçıvanoğlu Otomotiv DC İzmir
3.6 km · ZES · Type 2 · CCS2 · CHAdeMO
400kW
Berksoy Hotel
3.6 km · ZES · Type 2
22kW
LUMICLE İZMİR BERGAMA 120 kW DC
4.4 km · Lumicle · CCS2
120kW
Bahçıvanoğlu Otomotiv
5.8 km · ZES · Type 2 · CCS2
400kW
Source: EPDK licence record (ŞRJ/14933) · Updated: 2 November 2026 at 17:35 · How the data is collected
