Pruva 34 DC Şarj İstasyonu
360° Enerji · Pruva 34 Sitesi, İstanbul
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×2
HPC
Price
360° Enerji doesn't publish a price for this point. The current tariff is shown in the network's own app. 360° Enerji website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 99 points with known power in Bakırköy district, it is 3rd (180 kW). The nearest other DC point is 850 m away: Radisson BLU Hotel Ottomare (Ovolt, 80 kW). There are 237 more DC points within 10 km. Within 3 km there are 91 other charging points and 28 different networks in total.
The 360° Enerji network has 181 points in İstanbul province; this one is among those in the Bakırköy area.
- Power rank in Bakırköy
- 3 / 99
- Nearest other DC
- 850 m
- 3 km radius
- 92 points · 28 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the 360° Enerji app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Pruva 34 DC Şarj İstasyonu charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Pruva 34 DC Şarj İstasyonu have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
