Del Lago DC 120
360° Enerji · Esentepe, İstanbul Caddesi C Blok No:5 D:2, 54050 Serdivan/Sakarya, Sakarya
- Max power
- 120kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 120kW
CCS2×2
DC
Price
360° Enerji doesn't publish a price for this point. The current tariff is shown in the network's own app. 360° Enerji website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 38 points with known power in Serdivan district, it is 11th (120 kW). The nearest other DC point is 2.2 km away: Sakarya Teknokent-2 (Trugo, 180 kW). There are 66 more DC points within 10 km. Within 3 km there are 10 other charging points and 4 different networks in total.
The 360° Enerji network has 12 points in Sakarya province; this one is among those in the Serdivan area.
- Power rank in Serdivan
- 11 / 38
- Nearest other DC
- 2.2 km
- 3 km radius
- 11 points · 4 networks
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the 360° Enerji app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Del Lago DC 120 charging station?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Del Lago DC 120 have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Chargeinn Sakarya DEL Lago Hotel
0 m · Chargeinn
Del Lago AC 2
0 m · 360° Enerji · Type 2
22kW
Del Lago AC 1
0 m · 360° Enerji · Type 2
22kW
Q8 Akademi Sitesi, Serdivan - AC 3
1.8 km · OtoPriz · Type 2
22kW
Q8 Akademi Sitesi, Serdivan - AC 2
1.8 km · OtoPriz · Type 2
22kW
Q8 Akademi Sitesi, Serdivan - AC 1
1.8 km · OtoPriz · Type 2
22kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
