Bumerangkartal
360° Enerji · Soğanlık Yeni Mahallesi Aliağa Sokağı No:8 Kartal / İSTANBUL
- Max power
- 60kW
- Connectors
- 9
- Current
- DC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 60kW
CCS2×2
DC
- 22kW
Type 2×7
AC
Price
360° Enerji doesn't publish a price for this point. The current tariff is shown in the network's own app. 360° Enerji website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 116 points with known power in Kartal district, it is 25th (60 kW). The nearest other DC point is at the same address: Kartal Bumerang Rezidans (360° Enerji, 60 kW). There are 249 more DC points within 10 km. Within 3 km there are 132 other charging points and 40 different networks in total.
The 360° Enerji network has 181 points in İstanbul province; this one is among those in the Kartal area.
- Power rank in Kartal
- 25 / 116
- Nearest other DC
- at the same address
- 3 km radius
- 133 points · 40 networks
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the 360° Enerji app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Bumerangkartal charging station?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Bumerangkartal have?
This point has 9 recorded sockets: 2 × CCS2 (DC, 60 kW) and 7 × Type 2 (AC, 22 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Kartal Bumerang Rezidans
18 m · 360° Enerji · Type 2 · CCS2
60kW
ASF Otomotiv, Kartal
244 m · Eşarj
Kent Plus Konut Sitesi
377 m · Voltrun · Type 2
11kW
Kartal Koru Sitesi AC 1
452 m · GSM Charge · Type 2
22kW
Kartal Koru Sitesi AC 2
452 m · GSM Charge · Type 2
22kW
Kent Plus Konut Sitesi C Blok
470 m · Voltrun · Type 2
11kW
Source: EPDK licence record (ŞRJ/4597) · Updated: 2 November 2026 at 17:35 · How the data is collected
