9 public charging points in Vakfıkebir, Trabzon, across 7 networks. The fastest delivers 120 kW.
Vakfıkebir ranks 5th among the 13 districts of Trabzon by number of charging points; its share of the province's points is 4%. 6 points are DC fast (67%); across Trabzon the share is 36%.
The district's most powerful point is Yalıköy Millet Bahçesi-1 at 120 kW (Green Science). Average power is 69 kW; the median point is 90 kW. 7 networks: Otojet (2), Green Science (2), WAT Mobilite (1) and others. 1 point is listed as open 24/7.
Vakfikebir Ramada 120kW DC1
360° Enerji · CCS2
120kW
Yalıköy Millet Bahçesi-1
Green Science · CCS2
120kW
Yalıköy Millet Bahçesi-2
Green Science · CCS2
120kW
Aytemiz, Engin Petrol, Trabzon
Eşarj · CCS2
90kW
Otojet - Gürdal Petrol
Otojet · CCS2
30kW
TotalEnergies Gürdal Petrol
Otojet · CCS2
30kW
Aktif Mühendislik
Powerşarj · Type 2
22kW
Bizim Toptan Trabzon
WAT Mobilite · Type 2
22kW
Chargeinn Vakfıkebir Ramada Hotel
Chargeinn
In Vakfıkebir (Trabzon), there are 9 public EV charging points; 6 of them (67%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Vakfıkebir (Trabzon) is Green Science, with 2 points. It is followed by Otojet (2) and 360° Enerji (1). In total, stations from 7 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Vakfıkebir (Trabzon) is 120 kW, offered by Yalıköy Millet Bahçesi-1 (Green Science, Vakfıkebir). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
The most powerful DC fast charging point in Vakfıkebir (Trabzon) is Yalıköy Millet Bahçesi-1 (Green Science, Vakfıkebir) with 120 kW; approximate 10% to 80% times there: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The median power of the 6 DC points in the area is 120 kW; at this power the Togg T10X charges in about 40 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.
In Vakfıkebir (Trabzon), there is no DC point with 150 kW or more; the most powerful point offers 120 kW, where the Togg T10X charges from 10% to 80% in about 40 min. Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected
We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy