Charging stations in Vakfıkebir

9 public charging points in Vakfıkebir, Trabzon, across 7 networks. The fastest delivers 120 kW.

Charging points
9
DC fast
6
Max power
120kW
Networks
7

Charging infrastructure in Vakfıkebir: the numbers

Vakfıkebir ranks 5th among the 13 districts of Trabzon by number of charging points; its share of the province's points is 4%. 6 points are DC fast (67%); across Trabzon the share is 36%.

The district's most powerful point is Yalıköy Millet Bahçesi-1 at 120 kW (Green Science). Average power is 69 kW; the median point is 90 kW. 7 networks: Otojet (2), Green Science (2), WAT Mobilite (1) and others. 1 point is listed as open 24/7.

Rank in Trabzon
5 / 13
DC share
67%

Charging points

9 charging points

Charging networks in Vakfıkebir

Other districts in Trabzon

Frequently asked questions

How many charging stations are there in Vakfıkebir?

In Vakfıkebir (Trabzon), there are 9 public EV charging points; 6 of them (67%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.

Which charging network has the most stations in Vakfıkebir?

The most widespread charging network in Vakfıkebir (Trabzon) is Green Science, with 2 points. It is followed by Otojet (2) and 360° Enerji (1). In total, stations from 7 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.

What is the fastest charging station in Vakfıkebir?

The highest recorded power in Vakfıkebir (Trabzon) is 120 kW, offered by Yalıköy Millet Bahçesi-1 (Green Science, Vakfıkebir). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.

How long does it take to charge an electric car in Vakfıkebir?

The most powerful DC fast charging point in Vakfıkebir (Trabzon) is Yalıköy Millet Bahçesi-1 (Green Science, Vakfıkebir) with 120 kW; approximate 10% to 80% times there: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The median power of the 6 DC points in the area is 120 kW; at this power the Togg T10X charges in about 40 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.

Where can the Togg T10X charge at full speed in Vakfıkebir?

In Vakfıkebir (Trabzon), there is no DC point with 150 kW or more; the most powerful point offers 120 kW, where the Togg T10X charges from 10% to 80% in about 40 min. Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.

Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy