2 public charging points in Ladik, Samsun, across 2 networks. The fastest delivers 22 kW.
Ladik ranks 13th among the 15 districts of Samsun by number of charging points; its share of the province's points is 1%. There is no DC fast-charging point in the district; the nearest DC is Aytemiz Kayan Akaryakıt İstasyonu, 7.2 km away (Trugo, 180 kW, Havza).
The district's most powerful point is Hilas Termal Resort&Spa at 22 kW (ZES). 2 networks: ZES (1), Akmcharge (1).
Aytemiz Kayan Akaryakıt İstasyonu
7.2 km · Trugo · Havza · CCS2
180kW
Köfteci Hasan Usta
8.6 km · Trugo · Havza · CCS2
180kW
Orhan Acar Petrol Bekdiğin
8.6 km · ZES · Havza · Type 2 · CCS2
180kW
Konak Dinlenme Tesisleri-2
9.1 km · Trugo · Havza · CCS2
180kW
Konak Dinlenme Tesisleri
9.1 km · Trugo · Havza · CCS2
180kW
Havza Opet
15 km · Sharz · Havza · Type 2
22kW
In Ladik (Samsun), there are 2 public EV charging points; only AC charging is available, with no DC fast charging points. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Ladik (Samsun) is Akmcharge, with 1 point. It is followed by ZES (1). In total, stations from 2 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Ladik (Samsun) is 22 kW, offered by Hilas Termal Resort&Spa (ZES, Ladik). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
There are no DC fast charging points in Ladik (Samsun); the 2 points here provide AC charging. The nearest DC fast charger is about 7.2 km as the crow flies from the centre of the district's points: Aytemiz Kayan Akaryakıt İstasyonu in the Havza district (180 kW). On a long trip, you can plan your break around this point.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected
We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy