6 public charging points in Çamlıhemşin, Rize, across 2 networks. The fastest delivers 180 kW.
Çamlıhemşin ranks 4th among the 11 districts of Rize by number of charging points; its share of the province's points is 9%. 1 point is DC fast (17%); across Rize the share is 45%.
The district's most powerful point is Shell Çamlıhemşin at 180 kW (Trugo). Average power is 48 kW; the median point is 22 kW. 2 networks: Trugo (4), Aksa Şarj (2).
In Çamlıhemşin (Rize), there are 6 public EV charging points; 1 of them (17%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Çamlıhemşin (Rize) is Trugo, with 4 points. It is followed by Aksa Şarj (2). In total, stations from 2 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Çamlıhemşin (Rize) is 180 kW, offered by Shell Çamlıhemşin (Trugo, Çamlıhemşin). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
The most powerful DC fast charging point in Çamlıhemşin (Rize) is Shell Çamlıhemşin (Trugo, Çamlıhemşin) with 180 kW; approximate 10% to 80% times there: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.
In Çamlıhemşin (Rize), 1 DC fast charging point delivers 150 kW or more; the Togg T10X charges at its peak power at these points, and 10% to 80% takes about 35 min. Among them, the lowest known DC tariff is 14.98 ₺/kWh at Shell Çamlıhemşin (Trugo). Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected
We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy