1 public charging point in Korkut, Muş, on the Ekoşarj En Ekonomik, En Ekolojik Şekil network. The fastest delivers 22 kW.
Korkut ranks 4th among the 4 districts of Muş by number of charging points; its share of the province's points is 4%. There is no DC fast-charging point in the district; the nearest DC is Doğu Pasifik, Güroymak, 13 km away (OtoPriz, 180 kW, Güroymak).
Highest power 22 kW: EKOŞARJ - Korkut Belediye Başkanlığı, Ekoşarj En Ekonomik, En Ekolojik Şekil.
Güroymak Öğretmenevi
13 km · Trugo · Güroymak · Type 2
22kW
Doğu Pasifik, Güroymak
13 km · OtoPriz · Güroymak · CCS2
180kW
Diyar, Hasköy
16 km · OtoPriz · Hasköy · CCS2
120kW
Hasürünler Petrol
21 km · Trugo · Hasköy · CCS2
180kW
Hasürünler Akaryakıt İstasyonu
22 km · Trugo · Hasköy · CCS2
180kW
Diyar Petrol, Hasköy
24 km · OtoPriz · Hasköy · CCS2
180kW
In Korkut (Muş), there is 1 public EV charging point; only AC charging is available, with no DC fast charging points. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Korkut (Muş) is Ekoşarj En Ekonomik, En Ekolojik Şekil, with 1 point. All points here belong to this network; payment and starting a charge are done in the network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Korkut (Muş) is 22 kW, offered by EKOŞARJ - Korkut Belediye Başkanlığı (Ekoşarj En Ekonomik, En Ekolojik Şekil, Korkut). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
There are no DC fast charging points in Korkut (Muş); the only point here provides AC charging. The nearest DC fast charger is about 13 km as the crow flies from the centre of the district's points: Doğu Pasifik, Güroymak in the Güroymak district (180 kW). On a long trip, you can plan your break around this point.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected
We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy