Charging stations in Bozyazı

5 public charging points in Bozyazı, Mersin, across 5 networks. The fastest delivers 180 kW.

Charging points
5
DC fast
3
Max power
180kW
Networks
5

Charging infrastructure in Bozyazı: the numbers

Bozyazı ranks 9th among the 11 districts of Mersin by number of charging points; its share of the province's points is 2%. 3 points are DC fast (60%); across Mersin the share is 45%.

The district's most powerful point is Park Point Cafe Bozyazı at 180 kW (En Yakıt). Average power is 103 kW; the median point is 120 kW. 5 networks: Eşarj (1), En Yakıt (1), Trugo (1) and others. The median of known DC tariffs in the district is 14.98 ₺/kWh; the Mersin median is 14.90 ₺/kWh. 1 point is listed as open 24/7.

Rank in Mersin
9 / 11
DC share
60%

Charging points

5 charging points

Nearest charging points around Bozyazı

straight-line distance to the district centre

Charging networks in Bozyazı

Other districts in Mersin

Frequently asked questions

How many charging stations are there in Bozyazı?

In Bozyazı (Mersin), there are 5 public EV charging points; 3 of them (60%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.

Which charging network has the most stations in Bozyazı?

The most widespread charging network in Bozyazı (Mersin) is En Yakıt, with 1 point. It is followed by Eşarj (1) and Trugo (1). In total, stations from 5 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.

What is the fastest charging station in Bozyazı?

The highest recorded power in Bozyazı (Mersin) is 180 kW, offered by Park Point Cafe Bozyazı (En Yakıt, Bozyazı). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.

How long does it take to charge an electric car in Bozyazı?

The most powerful DC fast charging point in Bozyazı (Mersin) is Park Point Cafe Bozyazı (En Yakıt, Bozyazı) with 180 kW; approximate 10% to 80% times there: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The median power of the 3 DC points in the area is 180 kW; at this power the Togg T10X charges in about 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.

Where can the Togg T10X charge at full speed in Bozyazı?

In Bozyazı (Mersin), 2 DC fast charging points deliver 150 kW or more; the Togg T10X charges at its peak power at these points, and 10% to 80% takes about 35 min. Among them, the lowest known DC tariff is 14.98 ₺/kWh at Aslangil Dinlenme Tesisleri (Trugo). Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.

Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected