Charging stations in Darende

3 public charging points in Darende, Malatya, across 2 networks. The fastest delivers 180 kW.

Charging points
3
DC fast
2
Max power
180kW
Networks
2

Charging infrastructure in Darende: the numbers

Darende ranks 4th among the 5 districts of Malatya by number of charging points; its share of the province's points is 3%. 2 points are DC fast (67%).

The district's most powerful point is Darende Tiryandefil Otel at 180 kW (Trugo). Average power is 127 kW; the median point is 180 kW. 2 networks: Trugo (2), ŞS ŞARJSTOP Güvenli Şarj Noktası (1). The median of known DC tariffs in the district is 14.98 ₺/kWh; the Malatya median is 14.98 ₺/kWh.

Rank in Malatya
4 / 5
DC share
67%

Charging points

3 charging points

Nearest charging points around Darende

straight-line distance to the district centre

Charging networks in Darende

Other districts in Malatya

Frequently asked questions

How many charging stations are there in Darende?

In Darende (Malatya), there are 3 public EV charging points; 2 of them (67%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.

Which charging network has the most stations in Darende?

The most widespread charging network in Darende (Malatya) is Trugo, with 2 points. It is followed by ŞS ŞARJSTOP Güvenli Şarj Noktası (1). In total, stations from 2 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.

What is the fastest charging station in Darende?

The highest recorded power in Darende (Malatya) is 180 kW, offered by Darende Tiryandefil Otel (Trugo, Darende). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.

How long does it take to charge an electric car in Darende?

The most powerful DC fast charging point in Darende (Malatya) is Darende Tiryandefil Otel (Trugo, Darende) with 180 kW; approximate 10% to 80% times there: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.

Where can the Togg T10X charge at full speed in Darende?

In Darende (Malatya), 2 DC fast charging points deliver 150 kW or more; the Togg T10X charges at its peak power at these points, and 10% to 80% takes about 35 min. Among them, the lowest known DC tariff is 14.98 ₺/kWh at Darende Tiryandefil Otel (Trugo). Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.

Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected