3 public charging points in Çumra, Konya, across 2 networks. The fastest delivers 120 kW.
Çumra ranks 12th among the 19 districts of Konya by number of charging points; its share of the province's points is 1%. 2 points are DC fast (67%).
The district's most powerful point is Akbaşlar Tarım, Konya at 120 kW (Eşarj). Average power is 74 kW; the median point is 90 kW. 2 networks: Monokon Elektrik (2), Eşarj (1). 1 point is listed as open 24/7.
Karatay Termal Otel
33 km · Trugo · Karatay · CCS2
180kW
Shell Çomaklı
33 km · Trugo · Meram · CCS2
180kW
Karatay Termal Otel
35 km · ZES · Karatay · Type 2
22kW
Sakyatan 1
37 km · ZES · Karatay · Type 2
22kW
AKF Sosyal Tesisleri, Karatay
39 km · OtoPriz · Karatay · CCS2
180kW
AKF Grup Sosyal Tesisleri
39 km · Trugo · Karatay · CCS2
180kW
In Çumra (Konya), there are 3 public EV charging points; 2 of them (67%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Çumra (Konya) is Monokon Elektrik, with 2 points. It is followed by Eşarj (1). In total, stations from 2 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Çumra (Konya) is 120 kW, offered by Akbaşlar Tarım, Konya (Eşarj, Çumra). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
The most powerful DC fast charging point in Çumra (Konya) is Akbaşlar Tarım, Konya (Eşarj, Çumra) with 120 kW; approximate 10% to 80% times there: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.
In Çumra (Konya), there is no DC point with 150 kW or more; the most powerful point offers 120 kW, where the Togg T10X charges from 10% to 80% in about 40 min. Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected
We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy