4 public charging points in Uzunköprü, Edirne, across 4 networks. The fastest delivers 180 kW.
Uzunköprü ranks 5th among the 8 districts of Edirne by number of charging points; its share of the province's points is 4%. 2 points are DC fast (50%).
The district's most powerful point is Gümüş Tarım at 180 kW (Trugo). Average power is 64 kW; the median point is 30 kW. 4 networks: Eşarj (1), ZES (1), Trugo (1) and others. The median of known DC tariffs in the district is 14.98 ₺/kWh; the Edirne median is 14.98 ₺/kWh. 1 point is listed as open 24/7.
Pavli Organik Et ve Süt Ürünleri Otoparkı
16 km · Adze · Pehlivanköy
Öz-Saç
17 km · ZES · Ergene · Type 2
22kW
Hayrabolu OSB
27 km · Trugo · Hayrabolu · CCS2
180kW
Vinum Otel
28 km · ZES · Havsa
Enerji Petrol-Havsa
30 km · Energy Enerjik · Havsa · Type 2
22kW
Eksun Gıda, Babaeski
31 km · OtoPriz · Babaeski · Type 2
22kW
In Uzunköprü (Edirne), there are 4 public EV charging points; 2 of them (50%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Uzunköprü (Edirne) is Eşarj, with 1 point. It is followed by OtoPriz (1) and Trugo (1). In total, stations from 4 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Uzunköprü (Edirne) is 180 kW, offered by Gümüş Tarım (Trugo, Uzunköprü). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
The most powerful DC fast charging point in Uzunköprü (Edirne) is Gümüş Tarım (Trugo, Uzunköprü) with 180 kW; approximate 10% to 80% times there: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.
In Uzunköprü (Edirne), 1 DC fast charging point delivers 150 kW or more; the Togg T10X charges at its peak power at these points, and 10% to 80% takes about 35 min. Among them, the lowest known DC tariff is 14.98 ₺/kWh at Gümüş Tarım (Trugo). Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected
We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy