Charging stations in Ergani

4 public charging points in Ergani, Diyarbakır, across 3 networks. The fastest delivers 180 kW.

Charging points
4
DC fast
3
Max power
180kW
Networks
3

Charging infrastructure in Ergani: the numbers

Ergani ranks 6th among the 9 districts of Diyarbakır by number of charging points; its share of the province's points is 2%. 3 points are DC fast (75%).

The district's most powerful point is Ergani BP Akaryakıt İstasyonu at 180 kW (Trugo). Average power is 111 kW; the median point is 120 kW. 3 networks: CheckPoint (2), Asplus (1), Trugo (1).

Rank in Diyarbakır
6 / 9
DC share
75%

Charging points

4 charging points

Nearest charging points around Ergani

straight-line distance to the district centre

Charging networks in Ergani

Other districts in Diyarbakır

Frequently asked questions

How many charging stations are there in Ergani?

In Ergani (Diyarbakır), there are 4 public EV charging points; 3 of them (75%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.

Which charging network has the most stations in Ergani?

The most widespread charging network in Ergani (Diyarbakır) is CheckPoint, with 2 points. It is followed by Asplus (1) and Trugo (1). In total, stations from 3 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.

What is the fastest charging station in Ergani?

The highest recorded power in Ergani (Diyarbakır) is 180 kW, offered by Ergani BP Akaryakıt İstasyonu (Trugo, Ergani). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.

How long does it take to charge an electric car in Ergani?

The most powerful DC fast charging point in Ergani (Diyarbakır) is Ergani BP Akaryakıt İstasyonu (Trugo, Ergani) with 180 kW; approximate 10% to 80% times there: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The median power of the 3 DC points in the area is 120 kW; at this power the Togg T10X charges in about 40 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.

Where can the Togg T10X charge at full speed in Ergani?

In Ergani (Diyarbakır), 1 DC fast charging point delivers 150 kW or more; the Togg T10X charges at its peak power at these points, and 10% to 80% takes about 35 min. Among them, the lowest known DC tariff is 14.98 ₺/kWh at Ergani BP Akaryakıt İstasyonu (Trugo). Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.

Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy