4 public charging points in Buldan, Denizli, across 3 networks. The fastest delivers 180 kW.
Buldan ranks 8th among the 14 districts of Denizli by number of charging points; its share of the province's points is 2%. 3 points are DC fast (75%).
Highest power 180 kW: Otojet - TotalEnergies Çolaklar Petrol, Otojet. Average power is 141 kW; the median point is 180 kW. 3 networks: Otojet (2), Getacharge (1), Eşarj (1). 1 point is listed as open 24/7.
Zorlu Kızıldere 1 Jes
9.5 km · ZES · Sarayköy · Type 2
22kW
Kızıldere 3 Jeotermal Enerji Santrali
10 km · ZES · Buharkent · Type 2
22kW
Aydın Denizli Otoyolu 96.km Aydın Yönü
15 km · ZES · Sarayköy · CCS2
400kW
Fernas Otoyol İşletme ANA Kontrol Merkezi
15 km · En Yakıt · Sarayköy · CCS2
180kW
Aydın-Denizli Otoyolu Sarayköy Tes.(Aydın Yönü)
15 km · En Yakıt · Sarayköy · CCS2
180kW
Aydın-Denizli Otoyolu Sarayköy Tes.(Denizli Yönü)
15 km · En Yakıt · Sarayköy · CCS2
180kW
In Buldan (Denizli), there are 4 public EV charging points; 3 of them (75%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Buldan (Denizli) is Otojet, with 2 points. It is followed by Eşarj (1) and Getacharge (1). In total, stations from 3 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Buldan (Denizli) is 180 kW, offered by Otojet - TotalEnergies Çolaklar Petrol (Otojet, Buldan). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
The most powerful DC fast charging point in Buldan (Denizli) is Otojet - TotalEnergies Çolaklar Petrol (Otojet, Buldan) with 180 kW; approximate 10% to 80% times there: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The median power of the 3 DC points in the area is 180 kW; at this power the Togg T10X charges in about 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.
In Buldan (Denizli), 3 DC fast charging points deliver 150 kW or more; the Togg T10X charges at its peak power at these points, and 10% to 80% takes about 35 min. Among them, the lowest known DC tariff is 14.90 ₺/kWh at Bulteks, Denizli (Eşarj). Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected