Charging stations in Bozcaada

2 public charging points in Bozcaada, Çanakkale, across 2 networks. The fastest delivers 30 kW.

Charging points
2
DC fast
1
Max power
30kW
Networks
2

Charging infrastructure in Bozcaada: the numbers

Bozcaada ranks 11th among the 11 districts of Çanakkale by number of charging points; its share of the province's points is 1%. 1 point is DC fast (50%).

The district's most powerful point is Aytemiz, Esit Petrol, Bozcaada at 30 kW (Eşarj). 2 networks: Eşarj (1), Solarşarj (1). 1 point is listed as open 24/7.

Rank in Çanakkale
11 / 11
DC share
50%

Charging points

2 charging points

Nearest charging points around Bozcaada

straight-line distance to the district centre

Charging networks in Bozcaada

Other districts in Çanakkale

Frequently asked questions

How many charging stations are there in Bozcaada?

In Bozcaada (Çanakkale), there are 2 public EV charging points; 1 of them (50%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.

Which charging network has the most stations in Bozcaada?

The most widespread charging network in Bozcaada (Çanakkale) is Eşarj, with 1 point. It is followed by Solarşarj (1). In total, stations from 2 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.

What is the fastest charging station in Bozcaada?

The highest recorded power in Bozcaada (Çanakkale) is 30 kW, offered by Aytemiz, Esit Petrol, Bozcaada (Eşarj, Bozcaada). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.

How long does it take to charge an electric car in Bozcaada?

The most powerful DC fast charging point in Bozcaada (Çanakkale) is Aytemiz, Esit Petrol, Bozcaada (Eşarj, Bozcaada) with 30 kW; approximate 10% to 80% times there: Togg T10X 2 h 15 min, Tesla Model Y Long Range 1 h 55 min, MG4 (64 kWh) 1 h 35 min and BYD Atto 3 1 h 30 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.

Where can the Togg T10X charge at full speed in Bozcaada?

In Bozcaada (Çanakkale), there is no DC point with 150 kW or more; the most powerful point offers 30 kW, where the Togg T10X charges from 10% to 80% in about 2 h 15 min. Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.

Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy