Charging stations in Dazkırı

6 public charging points in Dazkırı, Afyonkarahisar, across 4 networks. The fastest delivers 180 kW.

Charging points
6
DC fast
2
Max power
180kW
Networks
4

Charging infrastructure in Dazkırı: the numbers

Dazkırı ranks 9th among the 16 districts of Afyonkarahisar by number of charging points; its share of the province's points is 3%. 2 points are DC fast (33%); across Afyonkarahisar the share is 47%.

Highest power 180 kW: Afyon Dazkırı Petrol Ofisi 180 kW DC, AOS. Average power is 85 kW; the median point is 22 kW. 4 networks: ZES (2), AOS (2), Sharz (1) and others. 2 points are listed as open 24/7.

Rank in Afyonkarahisar
9 / 16
DC share
33%

Charging points

6 charging points

Charging networks in Dazkırı

Other districts in Afyonkarahisar

Frequently asked questions

How many charging stations are there in Dazkırı?

In Dazkırı (Afyonkarahisar), there are 6 public EV charging points; 2 of them (33%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.

Which charging network has the most stations in Dazkırı?

The most widespread charging network in Dazkırı (Afyonkarahisar) is AOS, with 2 points. It is followed by ZES (2) and Ovolt (1). In total, stations from 4 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.

What is the fastest charging station in Dazkırı?

The highest recorded power in Dazkırı (Afyonkarahisar) is 180 kW, offered by Afyon Dazkırı Petrol Ofisi 180 kW DC (AOS, Dazkırı). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.

How long does it take to charge an electric car in Dazkırı?

The most powerful DC fast charging point in Dazkırı (Afyonkarahisar) is Afyon Dazkırı Petrol Ofisi 180 kW DC (AOS, Dazkırı) with 180 kW; approximate 10% to 80% times there: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.

Where can the Togg T10X charge at full speed in Dazkırı?

In Dazkırı (Afyonkarahisar), 2 DC fast charging points deliver 150 kW or more; the Togg T10X charges at its peak power at these points, and 10% to 80% takes about 35 min. Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.

Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy