1 public charging point in Yumurtalık, Adana, on the Voltrun network. The fastest delivers 10 kW.
Yumurtalık ranks 9th among the 9 districts of Adana by number of charging points; its share of the province's points is below 1%. There is no DC fast-charging point in the district; the nearest DC is Mıstık Usta(Güney)-Osmaniye Yönü, 23 km away (En Yakıt, 180 kW, Ceyhan).
The district's most powerful point is Alara MY World at 10 kW (Voltrun).
Mıstık Usta(Güney)-Osmaniye Yönü
23 km · En Yakıt · Ceyhan · CCS2
180kW
Mıstık Usta (Kuzey) - Adana Yönü
23 km · En Yakıt · Ceyhan · CCS2
180kW
Aytemiz Serhat Petrol
26 km · ZES · Ceyhan · Type 2
22kW
Mıstık Usta Dinlenme Tesisi Osmaniye Yönü
26 km · ZES · Ceyhan · CCS2
180kW
Mıstık Usta Dinlenme Tesisi Adana Yönü
26 km · ZES · Ceyhan · CCS2
180kW
Özel Ceyhan Çınar Hastanesi
27 km · Voltrun · Ceyhan · Type 2
22kW
In Yumurtalık (Adana), there is 1 public EV charging point; only AC charging is available, with no DC fast charging points. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Yumurtalık (Adana) is Voltrun, with 1 point. All points here belong to this network; payment and starting a charge are done in the network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Yumurtalık (Adana) is 10 kW, offered by Alara MY World (Voltrun, Yumurtalık). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
There are no DC fast charging points in Yumurtalık (Adana); the only point here provides AC charging. The nearest DC fast charger is about 23 km as the crow flies from the centre of the district's points: Mıstık Usta(Güney)-Osmaniye Yönü in the Ceyhan district (180 kW). On a long trip, you can plan your break around this point.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected
We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy